CASE STUDIES

Enhanced Oil Recovery Case Study 1 – Arkoma

Pre-Treatment Production

  • BOPD: 6
  • MCFD: 1,240

Post-Treatment Production

  • BOPD: 6
  • MCFD: 2,220

Current Production

  • BOPD: 6
  • MCFD: 1,600
Payback: 90 Days
Incremental BOE: 27,000

Arkoma 1 well was an Enhanced Oil Recovery (EOR) treatment performed in 2019. The well was drilled in 2017 with an initial production rate of 980 Mcfd of gas. By 2019, 30 days prior to treatment, the well was producing an average of 1,240 Mcfd. Post-treatment, the well increased gas production to an average of 2,220 Mcfd for 150 days. To-date, 270 days post-treatment, the incremental recovered volume is approximately 27,000 BOE. Treatment payback for the operator was approximately 90 days. 

Enhanced Oil Recovery Case Study 2 – BUDA

Pre-Treatment Production

  • BOPD: 2
  • MCFD: 30

Post-Treatment Production

  • BOPD: 13
  • MCFD: 205

Current Production

  • BOPD: 4
  • MCFD: 15
Payback: 270 Days
Incremental BOE: 11,800

BUDA 1 well was an early Enhanced Oil Recovery (EOR) case study performed in 2017 during the research and development phase. The well was drilled in 2011 with an initial production rate of 140 Bopd of oil and 1,400 Mcfd of gas. By 2017, 30 days prior to treatment, the well had fallen to an average of 2 Bopd and 30 Mcfd. Post-treatment, the well increased oil production to 11 Bopd for 180 days. ~1,100 days post-treatment, the to-date incremental recovered volume is approximately 11,800 BOE. Treatment payback for the operator was approximately 270 days.

Frac Hit Mitigation Case Study 1 – Eagleford

Pre-Treatment Production

  • BOPD: 50
  • MCFD: 0

Post-Treatment Production

  • BOPD: 140
  • MCFD: 1

Current Production

  • BOPD: 40
  • MCFD: 10
Payback: 30 Days
Incremental BOE: 19,000

Eagleford 1 well was a Frac Hit Protection (FHP) treatment performed in January 2019. The well was drilled in 2015 with an initial production rate of 780 Bopd of oil. By 2019, 30 days prior to treatment, the well was producing an average of 50 Bopd of oil. Post-treatment, the well increased oil production to an average of 100 Bopd for 150 days. ~500 days post-treatment, the to-date incremental recovered volume is approximately 19,000 BOE. Treatment payback for the operator was approximately 30 days. 

Frac Hit Mitigation Case Study 2 – Eagleford

Pre-Treatment Production

  • BOPD: 30
  • MCFD: 90

Post-Treatment Production

  • BOPD: 50
  • MCFD: 120

Current Production

  • BOPD: 45
  • MCFD: 20
Payback: 60 Days
Incremental BOE: 21,000

Eagleford Frac Hit Protection (FHP) 2 was a treatment performed in May 2019. The well was drilled in 2014 with an initial production rate of 140 Bopd of oil and 430 Mcfd of gas. By 2019, 30 days prior to treatment, the well had fallen to an average of 30 Bopd and 90 Mcfd. Post-treatment, the well increased production to an average of 90 Bopd and 220 Mcfd for 150 days. ~360 days post-treatment, the to-date incremental recovered volume is approximately 21,000 BOE. Treatment payback for the operator was approximately 60 days.

Frac Hit Mitigation Case Study 3 – Eagleford

Pre-Treatment Production

  • BOPD: 15
  • MCFD: 60

Post-Treatment Production

  • BOPD: 25
  • MCFD: 80

Current Production

  • BOPD: 25
  • MCFD: 20
Payback: 90 Days
Incremental BOE: 11,500

Eagleford Frac Hit Protection (FHP) 3 was a treatment performed in May 2019. The well was drilled in 2014 with an initial production rate of 280 Bopd of oil and 850 Mcfd of gas. By 2019, 30 days prior to treatment, the well had fallen to an average of 15 Bopd and 60 Mcfd. Post-treatment, the well increased production to an average of 45 Bopd and 140 Mcfd for 150 days. ~360 days post-treatment, the to-date incremental recovered volume is approximately 11,500 BOE. Treatment payback for the operator was approximately 90 days.